Construction method description of swimming pool brick
Customer satisfaction depends on how to select professionals who are skilled in the art of swimming pool bricks, so that the value of elegant swimming pool bricks can be fully reflected. Therefore, in promoting the development of "style" brand, construction personnel have become an important and indispensable partner. The key to our success lies in our specialty. In this part of the catalogue, we make the following quick guidelines for some necessary paving construction methods:
1. Check the construction materials
Before construction, carefully check the elegant swimming pool bricks in the packing box to see if there are enough swimming pool bricks to complete the work. On each packing box, we will display the product model, color number, production batch number and other details.
2. Smooth the wall foundation
This step is to flatten the foundation of the wall. The flattened wall must be smooth and of the same - color.
3.Scribe
Draw a line on the wall to record the exact location of each - swimming pool brick. Spread the 3 swimming pool tiles side by side on the ground so that the mortar joint between the tiles is the same as that in the - tile. Measure the overall width, and then draw the measured dimensions vertically and horizontally on the wall with a ruler and level to form a large square. Then divide the large square into 9 squares, and put 1 swimming pool brick in each square.
4.Prepare tile glue
Prepare the tile glue mixed in proportion and apply the tile glue with an ash shovel, but the applied area shall not exceed the area where 9 swimming pool bricks are placed. Firstly, the tile adhesive shall be smoothed with a smooth edge ash shovel, and then a - layer of uniform serrated stripes shall be plastered with a serrated edge ash shovel. Now, the swimming pool brick can be ready to be laid on the wall.
5.Paving and fixing
Because the swimming pool bricks are pasted with nets, they can be directly applied to the walls coated with ceramic tile glue. Lay the swimming pool bricks vertically. Please note: the gap between pastes must be consistent with the mortar joint of each paste.
6.reinforce
After each tile is positioned, tap the surface of the swimming pool tile with a gray board to make it firmly stick to the wall.
7.Ensure that the mortar joints are consistent
After each tile is fixed and before the joint filler is placed, the gap between bricks must be determined as a uniform width. In this way, we need to use a small ash shovel to adjust the mortar joint. This is a process that requires patience in the process of paving swimming pool bricks, but it is an important link in the process of paving.
8.Caulking agent
Prepare the required joint sealant. Use a small ash shovel, take a small amount of mixed joint sealant each time and apply it evenly on the surface of the swimming pool brick. The small ash shovel should move diagonally, first from bottom to top, and then from top to bottom to ensure that all mortar joints can be completely filled and there is no excess residue.
9.clean
Start cleaning the pool brick surface before the sealant dries out. Prepare two buckets, - one filled with detergent and - one filled with clean water. First, wet the dishcloth in the bucket filled with detergent without screwing it dry, and then wipe the surface of the swimming pool brick in a circle; Then soak the sponge in the second bucket with clean water, and then wipe the surface of the swimming pool brick with the sponge to remove all the residues. Wipe the surface with a sponge again until it is clean.
TEL:139-2485-5070 QQ : 570120516
E-mail:570120516@qq.com
ADD:No. 1, building 7, logistics warehouse, Dongcun, Nanzhuang Avenue, Chancheng District, Foshan