泳池砖厂家
your current location : Home >> News >> Company news

What are the specific construction links of swimming pool brick?

2021-07-27 10:32:18
a

Before paving mosaic swimming pool tiles, it is necessary to master the correct construction methods, carefully inspect all aspects, and strictly control each construction link. Before the formal commencement of construction, we need to carefully check the prepared swimming pool tiles in advance to ensure that the quantity is sufficient. The model, color number, production batch number and other data of swimming pool tiles should be marked on each packing box in advance.


The foundation of the wall of the swimming pool is leveled mainly to facilitate the operation when posting in the later stage and ensure that the wall is smooth and complete after being leveled. We can draw lines on the wall, mainly to record the position of swimming pool tiles. We can lay three mosaic tiles on the ground, but we should ensure that the mortar joints between the tiles are the same. Next, you can measure the overall width, draw a large square on the wall, and then divide the large square into 9 squares, and put a mosaic tile in each.



马赛克瓷砖


We mix the tile glue according to the corresponding proportion in advance, and use the ash shovel to apply the tile glue. We use the ash shovel with smooth edges to smooth the tile glue, and then use the ash shovel with serrated edges to wipe out a layer of uniform serrated stripes. Then we can directly lay tiles on the wall.


Because the mosaic swimming pool tiles are net pasted at the bottom, they can be directly used on the wall coated with ceramic tile glue to pave the prepared mosaic swimming pool tiles vertically. It is worth noting that the mortar joint and gap between each paste shall be consistent.


6. Reinforcement of ceramic tiles: after fixing and positioning each mosaic swimming pool brick, tap the surface of the ceramic tile with a gray board to make it firmly stick to the inner wall of the swimming pool.


7. The mortar joints between non tiled tiles shall be consistent: after each tile is fixed and before the joint filler is officially placed, we need to ensure that the gap is the same and unified. We can use a small mortar shovel to adjust these mortar joints. This link is not only a test of people's patience, but also a very important link.


8. Supplement appropriate joint sealant: we need to prepare the required joint sealant in advance, take a small amount of mixed joint sealant with a small ash shovel and apply it evenly on the surface of mosaic swimming pool tiles. During the operation, ensure that the small ash shovel moves diagonally from bottom to top, so as to ensure that the mortar joint can be filled and there is no excess residue.


9. Finish cleaning: we also need to clean the surface of ceramic tiles before the sealant is completely dry. Prepare two buckets in advance, one with detergent and the other with clean water. Wipe the surface of mosaic tiles in circles, then wipe off the residue with clean water and wipe the surface with sponge.


Recent browse:

Related products

Related news

contact

TEL:139-2485-5070    QQ : 570120516

E-mail:570120516@qq.com

ADD:No. 1, building 7, logistics warehouse, Dongcun, Nanzhuang Avenue, Chancheng District, Foshan

Scan to learn more

  • WeChat 1
    WeChat 1
COPYRIGHT © Foshan Fengcai building materials Co., LtdALL RIGHTS RESERVED record number: 粤ICP备2021033885号 ,Welcome to inquire!
Sitemap | RSS | XML
  • home
  • tel
  • top