泳池砖厂家
your current location : Home >> News >> Industry information

Unexpectedly, the tile paving requirements of the swimming pool are so high

2021-07-27 10:32:18
a

The standard swimming pool construction has special requirements in the standard design, which needs to meet the integrity of the swimming pool tile design and layout to meet the competition requirements, the technical quality should be strictly controlled, and the waterproof requirements are very high. Therefore, it is not just necessary to paste porcelain and mosaics all over the pool wall to pave the pool. Compared with the traditional tile paving construction of exterior wall and ground, the tile paving construction of standard swimming pool has the following characteristics:


泳池砖


1) The ceramic tile design and typesetting requirements of swimming pool are high, and the standard swimming pool shall comply with the ceramic tile typesetting requirements specified by fina.


2) The waterproof requirements are high. The swimming pool tiles need to be in contact with water for a long time, which has higher waterproof requirements than ordinary tiles. There are special requirements for the material selection of tiles, the binder of base course, the treatment of waterproof base course and the caulking between tiles.


3) There are many paving processes and high requirements to ensure the paving quality of ceramic tiles. We should also coordinate the installation of water supply, drainage and power supply and distribution facilities for the swimming pool.


Key points for tile paving:


① Before the construction of swimming pool tiles, strengthen technical disclosure and model guidance, formulate effective management measures, and solve common quality problems such as "seepage, leakage, air, crack and pollution".


② The base course shall be solid and flat without sundries, and the base course shall be watered and wetted before brick laying.


③ Strengthen material mobilization acceptance, pay attention to the selection of tile paving types in special parts of the swimming pool, accurately control the size of tiles to be cut, especially the corner tiles at the pool corner.


④ Pool bricks are bonded with special vitrified brick adhesive and filled with special joint filler, with a mortar thickness of 3mm.


⑤ After the pool wall is paved, the pool bottom can be paved, which is the position of handrails and other accessories.


⑥ Strengthen management and supervision, timely check workers' grid snapping line and tile joint, and use a horizontal guiding ruler to check the verticality and flatness of paved tiles.


⑦ After the completion of ceramic tile paving, the joint shall be filled with special joint filler to achieve uniform color and full gap. Curing measures shall be taken in time after joint filling.


Recent browse:

Related products

Related news

contact

TEL:139-2485-5070    QQ : 570120516

E-mail:570120516@qq.com

ADD:No. 1, building 7, logistics warehouse, Dongcun, Nanzhuang Avenue, Chancheng District, Foshan

Scan to learn more

  • WeChat 1
    WeChat 1
COPYRIGHT © Foshan Fengcai building materials Co., LtdALL RIGHTS RESERVED record number: 粤ICP备2021033885号 ,Welcome to inquire!
Sitemap | RSS | XML
  • home
  • tel
  • top